Open post

Green Park Plot 2.2, Reading

Green Park Plot 2.2, Reading


Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Turtle Bay Restaurant ceiling infill
Green Park 22
Green Park 22
Green Park 22
Green Park 22
Green Park 22
previous arrow
next arrow
Green Park 22
Green Park 22
Green Park 22
Green Park 22
Green Park 22
previous arrow
next arrow

About the Project

Huskisson architectural cable mesh installed as staircase cladding at plot 2.2, Green Park, Reading.

The mesh was fabricated as a continuous single form, 16 metres high. The mesh creates an aesthetically pleasing effect and provides the required security level along with a fire rating of '0'. Huskisson architecural cable mesh was the perfect solution for this client.

 

Open post

Reading International

Open post
Met Office Exeter Cladding - Staircase Gladstone PC 100/10

The Met Office, Exeter

The Met Office, Exeter


met-office-9-large
met-office-8-large
met-office-large
met-office1-large
met-office-10-large
met-office-b2-large
met-office3-large
met-office2-large
met-office-b1-large
previous arrow
next arrow
met-office-9-large
met-office-8-large
met-office-large
met-office1-large
met-office-10-large
met-office-b2-large
met-office3-large
met-office2-large
met-office-b1-large
previous arrow
next arrow

About the Project

Locker Gladstone PC architectural mesh installed at The Met Office in Exeter.

Gladstone PC 100/10 architectural mesh was used for external staircase cladding. Gladstone PC 74/3-75 was used as internal balustrading.

View DF Project Sheet: The Met Office

View project location using Google maps

Open post
London Bridge London Cladding - Staircase St James

London Bridge

London Bridge


london-bridge-8-large
london-bridge-3-large
london-bridge-7-large
london-bridge-4-large
london-bridge-1-large
london-bridge-5-large
london-bridge-2-large
london-bridge-9-large
london-bridge-6-large
previous arrow
next arrow
london-bridge-8-large
london-bridge-3-large
london-bridge-7-large
london-bridge-4-large
london-bridge-1-large
london-bridge-5-large
london-bridge-2-large
london-bridge-9-large
london-bridge-6-large
previous arrow
next arrow

About the Project

St James pre-crimped woven wire mesh staircase cladding on London Bridge.

The metal staircase provides pedestrian access from the bridge to the Thames river bank below, with the mesh panels carefully angled to show superb views of the Thames for those on the staircase, while also providing privacy for the adjacent office buildings.

The current London Bridge dates from 1831, although a number of bridges have been built on the same site, going back to the Romans 2000 years ago.

Open post
Gatwick Airport M.S.C.P.6 London Cladding - Staircase Shaldon 4/8

Gatwick Airport M.S.C.P.6

Open post
Deptford Railway Station London

Deptford Railway Station, London

Deptford Railway Station, London


deptford1-large
deptford4-large
deptford3-large
1
4
5
7
9
6
3
previous arrow
next arrow
deptford1-large
deptford4-large
deptford3-large
1
4
5
7
9
6
3
previous arrow
next arrow

About the Project

Gladstone 80/10 and Gladstone PC 80/10 installed at Deptford Railway Station, London.

Gladstone 80/10 was installed using the cable mesh tension system around the stair tower and Gladstone PC 80/10 was used as balustrading around the station and cycle store.

View PDF Project Sheet: Deptford Railway Station

Scroll to top