Open post
One New Change London Balustrading Churchill 14/14

Gordon Ramsay’s Restaurant at One New Change

Gordon Ramsay's Restaurant at One New Change


One-New-Change-1-large
One-New-Change-3-large
One-New-Change-2-large
previous arrow
next arrow
One-New-Change-1-large
One-New-Change-3-large
One-New-Change-2-large
previous arrow
next arrow

About the Project

Churchill 14/14 traditional pre-crimped wire mesh installed as balustrading at Gordon Ramsay's restaurant at One New Change in London.

Malin expanded metal was installed as cladding for the lift-shaft.

View PDF Project Sheet: One New Change

Open post
Deptford Railway Station London

Deptford Railway Station, London

Deptford Railway Station, London


deptford1-large
deptford4-large
deptford3-large
1
4
5
7
9
6
3
previous arrow
next arrow
deptford1-large
deptford4-large
deptford3-large
1
4
5
7
9
6
3
previous arrow
next arrow

About the Project

Gladstone 80/10 and Gladstone PC 80/10 installed at Deptford Railway Station, London.

Gladstone 80/10 was installed using the cable mesh tension system around the stair tower and Gladstone PC 80/10 was used as balustrading around the station and cycle store.

View PDF Project Sheet: Deptford Railway Station

Scroll to top