About the Project

3000 square metres of Cromarty Laminate mesh was installed to augment roof glazing at the iconic Waterloo International Station.

Locker conducted structural and tensile tests of this material at Bath University. Dimensions for fabrication of all 432 individual panels were determined by detailed 3d laser survey. Locker then used their own unique installation system to securely retain the material within the roof space.

"Our Client is more than impressed that we have delivered the Contract on time and within budget. I would just like to take this opportunity to personally thank you both for all your efforts and endeavours in helping us to complete the contract. The service, reliability and professionalism that you have bestowed upon is during the course of the contract is very much appreciated." Phil Webb, Managing Director, Walker Construction

View PDF Project Sheet: Waterloo International Station

View project location on Google maps

Open post
Leeds ERF Leeds Cladding - Facade Chineham

Recycling & Energy Recovery Facility (ERF), Leeds

Recycling & Energy Recovery Facility (ERF), Leeds


a
3
4
leeds-erf-17-large
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
b
1
2
leeds-erf-wide-large
leeds-erf-13-large
leeds-erf-14-large
leeds-erf-15-large
leeds-erf-16-large
leeds-erf-18-large
previous arrow
next arrow
a
3
4
leeds-erf-17-large
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
b
1
2
leeds-erf-wide-large
leeds-erf-13-large
leeds-erf-14-large
leeds-erf-15-large
leeds-erf-16-large
leeds-erf-18-large
previous arrow
next arrow

About the Project

The Leeds Recycling and Energy Recovery Facility (ERF) 42m high main building is clad in Locker tension fabric mesh. Chineham mesh is used to clad the roof, and Caledonian 752 mesh is used for the sides and lower levels.

Created by internationally renowned architect, Jean-Robert Mazaud of S’PACE Architecture, the facility's design minimises offensive odours by drawing air constantly into the building from outside. The open weave of the tension fabric mesh facilitates this perfectly while blending beautifully with the curved timber frame to also present a visually appealing facade.

Main contractor: Clugston Construction Ltd

View PDF Project Sheet: Leeds ERF

View project location using Google maps

 

Open post
Chineham ERF Basingstoke Cladding - Facade Chineham

Chineham ERF

Chineham ERF, Basingstoke


Chineham ERF facade cladding
Chineham ERF facade cladding
chineham-basingstoke-lge
chineham-basingstoke-1-lge
previous arrow
next arrow
chineham-basingstoke-lge
chineham-basingstoke-1-lge
previous arrow
next arrow

About the Project

Tension Fabric Mesh installation at Chineham Energy Recovery Facility for Veolia Environmental Services, Basingstoke.

View project location using Google maps

Scroll to top