Open post
Leeds ERF Leeds Cladding - Facade Chineham

Recycling & Energy Recovery Facility (ERF), Leeds

Recycling & Energy Recovery Facility (ERF), Leeds


previous arrow
next arrow
previous arrownext arrow
Slider

About the Project

The Leeds Recycling and Energy Recovery Facility (ERF) 42m high main building is clad in Locker tension fabric mesh. Chineham mesh is used to clad the roof, and Caledonian 752 mesh is used for the sides and lower levels.

Created by internationally renowned architect, Jean-Robert Mazaud of S’pace Architects, the facility's design minimises offensive odours by drawing air constantly into the building from outside. The open weave of the tension fabric mesh facilitates this perfectly while blending beautifully with the curved timber frame to also present a visually appealing facade.

Main contractor: Clugston Construction Ltd

View PDF Project Sheet: Leeds ERF

View project location using Google maps

 

Open post
Chineham ERF Basingstoke Cladding - Facade Chineham

Chineham ERF

Chineham ERF, Basingstoke


previous arrow
next arrow
previous arrownext arrow
Slider

About the Project

Tension Fabric Mesh installation at Chineham Energy Recovery Facility for Veolia Environmental Services, Basingstoke.

View project location using Google maps

Scroll to top