Centre MK, MK Shopping Centre
Centre MK 3
Centre MK 1
Centre MK 2
Centre MK 4
Centre MK 5
About the Project
These two striking kite structures proudly hang from tensioned wire ropes, in the North and South entrance atria at the iconic MK Shopping Centre. They are constructed from CNC laser-mitred aluminium tubular framework infilled with Locker’s expanded metal Malin mesh.
Locker undertook the computer-modelled detailed design, complex 3D mitred welding. The framework and mesh were grit-blasted and polyester powder coated Aztec gold.
The sculptures were a challenging puzzle to install however our skilled rigging team completed the work ahead of schedule over 21 continuous nights.
"I’d just like to say a sincere thank you, on behalf of myself and the rest of Princebuild project team, to you all and all of your operatives who have been involved in delivering Sunset Walk. The project has been highly challenging and very intense. Despite this, the project has been delivered to an excellent standard and we have an extremely satisfied client. Thank you. " - Carl Newbigging, Project Manager, Princebuild Limited.